HomeGlossarySCADA for Water Systems Tender
Water and IrrigationSCADA

SCADA for Water Systems Tender

A SCADA for water systems tender is an NIT for supply, installation, and integration of supervisory control and data acquisition systems for real-time monitoring of water supply or irrigation networks.

Quick answer

A SCADA for water systems tender is an NIT for supply, installation, and integration of supervisory control and data acquisition systems for real-time monitoring of water supply or irrigation networks.


A SCADA (Supervisory Control and Data Acquisition) for water systems tender is an NIT issued by water boards, PHEDs, irrigation departments, or Smart City SPVs for the supply, installation, configuration, integration, and O&M of real-time monitoring and control systems that automate pump stations, regulate water flow, track reservoir levels, and detect leakages across water supply or irrigation distribution networks.

What is a SCADA for Water Systems Tender?

SCADA tenders for water systems typically cover: remote terminal units (RTUs) or programmable logic controllers (PLCs) at pump stations and distribution points, flow meters and pressure transmitters, water quality sensors (turbidity, chlorine, pH), communication infrastructure (GPRS/4G/fibre), SCADA servers and human-machine interface (HMI) software, operator workstations, and integration with GIS for pipe network mapping. Annual maintenance contracts (AMC) are often bundled with the initial supply and commissioning contract.

These are technology-intensive tenders where technical evaluation carries significant weight. Most use a two-bid system: the technical bid assesses system architecture, cyber security compliance, hardware specifications, software licensing, and the bidder's relevant SCADA implementation experience; the financial BOQ is opened only for technically qualified bidders. EMD is typically 2% of the estimated value, and performance security of 5-10% is required upon award.

SCADA tenders are published on CPPP and state e-procurement portals. Central scheme guidelines under Jal Jeevan Mission require sensor-based real-time monitoring for all district water supply schemes, creating a large pipeline of SCADA tenders across India.

Why SCADA for water systems tenders matter for Indian government suppliers

JJM's mandate for sensor-based monitoring across 6 lakh villages is driving one of the largest SCADA deployment programmes in Indian history. Smart City Mission has already tendered SCADA for water supply in 100 cities. This creates sustained demand for SCADA hardware vendors, system integrators, IoT platform companies, GIS firms, and AMC service providers. IT companies with relevant experience in utilities SCADA can find significant and recurring contract opportunities in this segment.

Example

A system integrator bids for a SCADA and telemetry tender issued by the Haryana Urban Development Authority for 45 water pumping stations in Gurugram. The NIT specifies installation of RTUs, flow meters, pressure sensors, and a central SCADA server with 5-year AMC. The bidder submits a technical bid showing experience in SCADA for at least 30 pump stations in a single project and an EMD of Rs 12 lakh. The firm qualifies technically and wins as L1 on the financial BOQ at Rs 5.8 crore.

Frequently Asked Questions

What IT and communication standards do water SCADA tenders typically specify?

Tenders commonly specify IEC 60870-5-101/104 or DNP3 protocols for SCADA communication, MODBUS for local device communication, OPC-UA for data integration, and IS/IEC 62443 for industrial cyber security. Some tenders specify GPRS/4G SIM-based communication; others require optical fibre where available infrastructure exists.

Can IT companies without direct water-sector experience bid for SCADA tenders?

Experience in SCADA for other utility sectors (power distribution, gas networks) may be considered equivalent to water system experience in some tenders. Alternatively, IT companies can form a consortium with a water infrastructure contractor or use a sub-contractor arrangement where the SCADA specialist handles technology while a civil/works contractor handles physical installation.

Is JJM creating mandatory SCADA requirements for all water supply schemes?

Yes. Under JJM's Sensor Based IoT based real-time monitoring framework, all piped water supply schemes above a certain size must have flow sensors, pressure sensors, and water quality sensors with real-time data transmission to district and state dashboards. This is driving SCADA and IoT tenders across all 28 states.

What is the typical contract duration for water SCADA tenders?

SCADA tenders typically include an initial supply and commissioning phase of 6-12 months followed by a mandatory AMC (Annual Maintenance Contract) of 3 to 5 years. Some tenders are structured as a comprehensive 7-year Design-Supply-Install-Operate contract, ensuring the vendor remains responsible for system uptime throughout the warranty and maintenance period.

How Bid India helps

Bid India puts SCADA for Water Systems Tender to work inside your capture and proposal workflow.

Central government tenders

See Bid India in action

Book a demo and we will show you the platform using your actual contract data.